The composition factors of PCBA delivery:

1.The delivery time of PCB light board is relatively stable, and the delivery time of PCB board of four layers and below is usually about one week;

2.component procurement delivery time span is very large, if they are all spot materials, can be completed within a week. If you need to place a foreign order, it will take two or three weeks, but it will take several months.

3.PCBA assembly test delivery time is relatively stable, usually one or two weeks after the board is finished.


How to shorten the procurement cycle of components?

In the context of the Sino-US trade war, the price of electronic components has risen dramatically, and some types of components are difficult to purchase. This has greatly increased the difficulty of PCBA procurement. On the one hand, it has to control the procurement cost. It is also necessary to purchase materials back as soon as possible, especially for some imported materials, which need to be purchased from abroad, often taking one or two months, or longer.


After ordering, the customer hopes to get the product as soon as possible, so in order to avoid this situation, we must first consider whether we can find alternative materials. If we can find alternative materials, and the stock can be purchased immediately, it is The best way to solve the problem, if the material can not be replaced, then we need to estimate and order in advance, the time to purchase the material is greatly reduced, before the material needs one or two months, before the order is prepared, one or two It will be received in the week, which will greatly shorten the delivery time of the entire PCBA.